Tag: CAMSHAFT INSTALLATION

PROJECT LS2, PART 3 (C)

PROJECT LS2, PART 3 (C)

Goodson reluctor ring installer jig is an absolute must for installing LS crank timing wheels. The Goodson tool indexes the ring via the 8mm hole in the ring face. The 8mm dowel is pictured here. It’s attached to a tang on the outside of the tool. An internal dowel in the tool engages into the [...]

Read more...

PROJECT 632, PART 3 (B)

PROJECT 632, PART 3 (B)

CAM BEARING INSTALLATION Note: The cam bores feature sharp edges. To aid in camshaft bearing installation, first deburr the edges with a sharp scraper. Once all block grinding, tapping, and deburring was finished, the block was thoroughly washed, rinsed, and blow-dried, with 5W30 engine oil applied to the cylinder walls to prevent surface-rusting. The camshaft [...]

Read more...