PROJECT LS2, PART 3 (F)

ls64

All head studs were installed finger-tight.

ls65

Our taller-than-OE Crane roller lifters required the use of spacer washers between the block and lifter buckets.

ls66

The oiled roller lifters are inserted into the OE plastic lifter buckets. These register flat-to-flat, orienting the lifters properly for roller bearing operation at the lobes.

ls67

With all four lifters snapped into the lifter bucket, the assembly is then installed.

ls68

Guide the package of lifters into their respective bores simultaneously. This was surprisingly easy.

ls69

Push the package of lifters until the tray fully seats.

ls70

A single 6mm x 1.0 bolt secures each lifter bucket to the block. I added a dab of Valco medium thread locker to the threads. Notice the shoulder under the bolt head. This centers the lifter bucket to the block.

ls71

This photo shows the left side lifter assemblies secured in place.

ls72

A shot of our short block, ready for heads.

ls73

A pushrod was used to fully seat each lifter. Simply push down on the lifter to bring it into contact with the lobe. The lifters are still registered in the buckets for operational orientation.

ls74

Our head gaskets are MLS type from MAHLE Victor. Each gasket is marked FRONT for easy orientation. Cooling passages must be located at the rear of the deck. The right deck is seen here.

ls75

The left deck is shown in this photo. Notice that sections of the gasket bridge across the lifter buckets. Makes sure to install the lifters before installing the head gaskets.

ls76

Our Trick Flow TFS-3060T001-C02 aluminum heads feature CNC-machined ports and chambers.

ls77

Intake ports are the cathedral style, measuring 3.250” x 1.070” and featuring a port volume of 225cc.

ls78

Exhaust ports are 1.460” x 1.670” ovals, with a volume of 80cc.

ls79

Chambers are 65cc in volume. Intake valves are 2.055”. Exhaust valves are 1.575”.

ls80

As a result of precise CNC machining, all chambers are matched at 65cc volume.

ls81

Using a pencil magnet will greatly ease installation of the inboard (recessed) main stud washers.

ls82

All head primary head stud nuts were torqued to 80 lbs./ft. with ARP moly. These were tightened in three progressive steps.

ls83

The upper 8mm head stud nuts were snugged to 22 lbs./ft. with ARP moly.